
After it had been noticed for some time that the rear area of the cinema roof (behind the stage) was leaking and the ceiling had literally “fallen on our heads”, the roof was replaced at short notice. The middle section of the cinema was already extensively renovated with a corrugated metal roof in 2024. The front area, above the old main entrance, is still on the agenda. The condition of the roof here is still very poor.